Company Name | : | PT BUMILOKA CIKASO ENERGI | Description | : | Pengadaan Tools dan Consumble PLTM Cikaso |
---|---|---|---|---|---|
PRF No | : | 00049/BCE/XII/2024 | Maker | : | Anthony Sukardy |
PRF Date | : | 08-Dec-2024 | PIC Proclog | : | Fina Anggraini |
Item | Date Needed | Specification | Quantity | Attachment | |
---|---|---|---|---|---|
1 | Kunci Ring Pas |
08-Jan-2025 | Uk. 8 sd 32mm | 1 Set | |
2 | Kunci Ring Pas 33mm |
08-Jan-2025 | Uk. 33mm | 2 Pcs | |
3 | Kunci Ring Pas 36mm |
08-Jan-2025 | Uk. 36mm | 2 Pcs | |
4 | Kunci Ring Pas 38mm |
08-Jan-2025 | Uk. 38mm | 2 Pcs | |
5 | Kunci Ring Pas 46mm |
08-Jan-2025 | Uk. 46mm | 2 Pcs | |
6 | Kunci Pukul Pas 46mm |
08-Jan-2025 | Uk. 46mm | 2 Pcs | |
7 | Kunci Pukul Ring 46mm |
08-Jan-2025 | Uk. 46mm | 2 Pcs | |
8 | Kunci Pukul Pas 50mm |
08-Jan-2025 | Uk. 50mm | 2 Pcs | |
9 | Kunci Pukul Ring 50mm |
08-Jan-2025 | Uk. 50mm | 2 Pcs | |
10 | Kunci Pukul Pas 70mm |
08-Jan-2025 | Uk. 70mm | 2 Pcs | |
11 | Kunci Pukul Ring 70mm |
08-Jan-2025 | Uk. 70mm | 2 Pcs | |
12 | Kunci Pukul Pas 75mm |
08-Jan-2025 | Uk. 75mm | 2 Pcs | |
13 | Kunci Pukul Ring 75mm |
08-Jan-2025 | Uk. 75mm | 2 Pcs | |
14 | Obeng Plat Pukul Mechanical |
08-Jan-2025 | 2 Set | ||
15 | Obeng Plus Pukul Mechanical |
08-Jan-2025 | 2 Set | ||
16 | Obeng Plat Electrical |
08-Jan-2025 | Tekiro 1000V | 2 Set | |
17 | Obeng Plus Electrical |
08-Jan-2025 | Tekiro 1000V | 2 Set | |
18 | Tang Potong |
08-Jan-2025 | 1000V | 2 Pcs | |
19 | Tang Lancip |
08-Jan-2025 | 1000V | 2 Pcs | |
20 | Tang Kupas Kabel / Stripper |
08-Jan-2025 | Uk. Tang Kupas Size 1.0-1.6-2.0-2.6-3.2 (Tekiro) | 2 Pcs | |
21 | Kunci Shock |
08-Jan-2025 | Uk. 8 sd 32mm (Tekiro) | 1 Set | |
22 | Kunci Shock 33mm |
08-Jan-2025 | Uk. 33mm Taparia | 2 Pcs | |
23 | Kunci Shock 34mm |
08-Jan-2025 | Uk. 34mm Taparia | 2 Pcs | |
24 | Kunci Shock 36mm |
08-Jan-2025 | Uk. 36mm Taparia | 2 Pcs | |
25 | Kunci Shock 46mm |
08-Jan-2025 | Uk. 46mm Taparia | 2 Pcs | |
26 | Kunci Shock 55mm |
08-Jan-2025 | Uk. 55mm Taparia | 2 Pcs | |
27 | Kunci Shock 70mm |
08-Jan-2025 | Uk. 70mm Taparia | 2 Pcs | |
28 | Kunci Pipa 14 Inchi |
08-Jan-2025 | Uk. 14 Inchi Tekiro | 2 Pcs | |
29 | Kunci Pipa 46 Inchi |
08-Jan-2025 | Uk. 46 Inchi Tekiro | 2 Pcs | |
30 | Kunci Inggris 8 Inchi |
08-Jan-2025 | Uk. 8 Inchi Tekiro | 2 Pcs | |
31 | Impact Baut |
08-Jan-2025 | Kapasitas 1000NM 99V Tekiro | 2 Set | |
32 | Palu Karet |
08-Jan-2025 | Uk. 12, 16,24 OZ Tekiro | 1 Set | |
33 | Martil 1kg |
08-Jan-2025 | Uk. 1kg | 2 Pcs | |
34 | Martil 2kg |
08-Jan-2025 | Uk. 2kg | 2 Pcs | |
35 | Martil 5kg |
08-Jan-2025 | U. 5kg | 1 Pcs | |
36 | Measuring Tape 5 meter |
08-Jan-2025 | Tekiro | 1 Pcs | |
37 | Kunci L Set |
08-Jan-2025 | Uk. 1,5mm sd 10mm Tekiro | 2 Set | |
38 | Kunci L Bintang Set |
08-Jan-2025 | Uk. 1,5mm sd 10mm Tekiro | 2 Set | |
39 | Torpedo Level |
08-Jan-2025 | Uk. 12 Inchi Tekiro | 2 Pcs | |
40 | Torpedo Level |
08-Jan-2025 | Uk. 24 Inchi | 1 Pcs | |
41 | Sigmat / Jangka Sorong Digital |
08-Jan-2025 | Uk. 300mm Mitutoyo | 1 Unit | |
42 | Sigmat / Jangka Sorong |
08-Jan-2025 | Uk. 300mm Mitutoyo | 1 Unit | |
43 | Sigmat / Jangka Sorong |
08-Jan-2025 | Uk. 400mm Mitutoyo | 1 Unit | |
44 | Alat Ukur Dart Baut |
08-Jan-2025 | Uk. 62G s/d 4G2 1/4 2 1/2 Tekiro | 2 Pcs | |
45 | Center Pen / Penitik |
08-Jan-2025 | Uk. 10mm | 2 Pcs | |
46 | Tracker 3 Jaw Puller |
08-Jan-2025 | Uk. 4 Inchi | 2 Pcs | |
47 | Tracker 3 Jaw Puller |
08-Jan-2025 | Uk. 7Inchi | 1 Pcs | |
48 | Kunci L 22mm |
08-Jan-2025 | Uk. 22mm Tekiro | 2 Pcs | |
49 | Kunci L 24mm |
08-Jan-2025 | Uk. 24mm Tekiro | 2 Pcs | |
50 | Kunci L 27mm |
08-Jan-2025 | Uk. 27 mm Tekiro | 2 Pcs | |
51 | Feelr Gauge 100mm |
08-Jan-2025 | Uk. 0,2mm sd 10mm 100mm | 1 Pcs | |
52 | Feeler Gauge 200mm |
08-Jan-2025 | Uk. 0,2mm sd 10mm 200mm | 1 Pcs | |
53 | Dial Indicator range 5mm |
08-Jan-2025 | Dial Indicator range 5mm Mitutoyo | 6 Pcs | |
54 | Dial Indiactor Stand |
08-Jan-2025 | 6 Set | ||
55 | Precicion Level |
08-Jan-2025 | Uk. 0,02mm sd 200mm | 1 Unit | |
56 | Accumulator Pressure Gauge Kit |
08-Jan-2025 | Accumulator Pressure Gauge Kit (EPE Proces Filter & Accumulator PVT LtD) 0 - 400Bar 6000PSI Model : PC - 280/70 | 1 Set | |
57 | Pressure Gauge Acumulator |
08-Jan-2025 | 0 - 160 Bar / Wika | 1 Set | |
58 | Accumulator Pressure Gauge Kit |
08-Jan-2025 | Accumulator Pressure Gauge Kit (EPE Proces Filter & Accumulator PVT LtD) 0 - 400Bar 6000PSI Model : PC - 280/70 | 1 Set | |
59 | Kunci Torsi ( Torque Wrench) GripHold GTW-5 00 |
08-Jan-2025 | Kunci Torsi 135 - 675 N.m ( Torque Wrench) GripHold GTW-5 00 | 1 Unit | |
60 | Kunci Torsi ( Torque Wrench) 3/4 |
08-Jan-2025 | Kunci Torsi 200 - 1000 N.m ( Torque Wrench) 3/4 | 1 Unit | |
61 | Kunci Torsi (Torque Wrench) |
08-Jan-2025 | Kunci Torsi (Torque Wrench) 1000 - 1900 N.m | 1 Unit | |
62 | Hand Torque HT 3 Torque Multiplier Kit |
08-Jan-2025 | Hand Torque HT 3 Torque Multiplier Kit 2700 N.m. Part No: 17221. 3/4 | 1 Unit | |
63 | Mistar (Straight Ruler) |
08-Jan-2025 | 1 meter | 1 Pcs | |
64 | Digital Outside Micrometer |
08-Jan-2025 | 0-25mmx0,001mm Tekiro | 1 Unit | |
65 | Jack Hydroulic - Enerpack 50T |
08-Jan-2025 | Jack Hydroulic - Enerpack 50T | 2 Unit | |
66 | Jack Hydroulic 30T |
08-Jan-2025 | Jack Hydroulic 30T | 2 Unit | |
67 | Jack Hydroulic 10T |
08-Jan-2025 | Jack Hydroulic 10T | 2 Unit | |
68 | Jack Ulir-DJMC 20T |
08-Jan-2025 | Jack Ulir-DJMC 20T | 2 Unit | |
69 | Jack Ulir - Masko Tech 50T |
08-Jan-2025 | Jack Ulir - Masko Tech 50T | 2 Unit | |
70 | D Shackle - FERRETERRO 6,5T |
08-Jan-2025 | D Shackle - FERRETERRO 6,5T | 4 Pcs | |
71 | D Shackle - FERRETERRO 12T |
08-Jan-2025 | D Shackle - FERRETERRO 12T | 4 Pcs | |
72 | D Shackle - Damar 35T |
08-Jan-2025 | D Shackle - Damar 35T | 6 Pcs | |
73 | Lever Block |
08-Jan-2025 | Lever Block 1/2 Ton | 2 Pcs | |
74 | Lever Block |
08-Jan-2025 | Lever Block 3 Ton | 2 Pcs | |
75 | Hydroulic Crimping/Tang Press 20kV |
08-Jan-2025 | Hydroulic Crimping 400mm Tekiro | 1 Set | |
76 | Webbing 2 Ton |
08-Jan-2025 | Webbing 2 Ton | 4 Pcs | |
77 | Webbing 5 Ton |
08-Jan-2025 | Webbing 5 Ton | 2 Pcs | |
78 | Webbing 50 Ton |
08-Jan-2025 | Webbing 50 Ton | 2 Pcs | |
79 | Sling Spanset 50 Ton |
08-Jan-2025 | Sling Spanset 50 Ton | 2 Pcs | |
80 | Hand Pallet Truck |
08-Jan-2025 | Hand Pallet Truck 2.5Ton | 1 Unit | |
81 | Webbing Trek Orange 5 Ton |
08-Jan-2025 | Webbing Trek Orange 5 Ton | 2 Set | |
82 | Body Harness |
08-Jan-2025 | Body Harness Full Body | 4 Pcs | |
83 | Chainblock 1Ton |
08-Jan-2025 | Chainblock Shuang Ge 1Ton | 2 Unit | |
84 | Chainblock 2Ton |
08-Jan-2025 | Chainblock Shuang Ge 2Ton | 2 Unit | |
85 | Chainblock 10Ton |
08-Jan-2025 | Chainblock Krisbow 10Ton | 1 Unit | |
86 | Gerinda Tangan 4 Inchi |
08-Jan-2025 | Gerinda Tangan 4Inchi | 1 Unit | |
87 | Air Compresor |
08-Jan-2025 | Air Compresor 2HP Shark + Slang kompresor 20mter + Stang | 1 Set | |
88 | Air Compresor |
08-Jan-2025 | Air Compresor 4HP Shark | 1 Unit | |
89 | Trafo Las 1Phasa |
08-Jan-2025 | Trafo Las 200W 1 Phasa Lakoni | 1 Unit | |
90 | Electroda Driyer |
08-Jan-2025 | Merk Lion | 1 Unit | |
91 | Oksigen |
08-Jan-2025 | Isi Ulang Oksigen 12kg | 10 Tabung | |
92 | Nitrogen N2 |
08-Jan-2025 | Isi Ulang Nitrogen 12Kg | 10 Tabung | |
93 | Gas LPG |
08-Jan-2025 | Isi Ulang Gas 12kg | 10 Tabung | |
94 | Solder |
08-Jan-2025 | 3 Unit | ||
95 | Timah Solder |
08-Jan-2025 | 2 Roll | ||
96 | Vacum Solder |
08-Jan-2025 | 2 Pcs | ||
97 | Stik 20kV |
08-Jan-2025 | Stik 20kV Telescopic Ritz | 1 Set | |
98 | Sarung Tangan 20kV |
08-Jan-2025 | Sarung Tangan 20kV | 2 Pasang | |
99 | D shackle 3 ton |
08-Jan-2025 | D shackle 3Ton | 6 Pcs | |
100 | D Shackle 1 Ton |
08-Jan-2025 | D Shackle 1Ton | 6 Pcs | |
101 | Ragum 320mm |
08-Jan-2025 | Ragum 320mm | 1 Unit | |
102 | Cutting Wheel |
08-Jan-2025 | Cutting Wheel Ryo RCO 355-1 | 1 Unit | |
103 | Cutting Torch |
08-Jan-2025 | Cutting Torch (Mata Tembaga Koikel) + Slang 50meter | 1 Set | |
104 | Digital Earth Tester |
08-Jan-2025 | Digital Earth Tester Kyoritsu KEW 4105DL | 1 Unit | |
105 | High Voltage Insulation Tester |
08-Jan-2025 | High Voltage Insulation Tester KEW 3128 KYORITSU | 1 Unit | |
106 | Sepatu Safety 20kV |
08-Jan-2025 | Sepatu Safety 20kV | 2 Pasang | |
107 | Multi Tester |
08-Jan-2025 | Multi Tester Electrician Fluke 117 | 3 Unit | |
108 | Earth Resistance Tester (Digital) |
08-Jan-2025 | Earth Resistance Tester (Digital) Waco SL.NO 374883 | 1 Unit | |
109 | Vibration sensor Precise |
08-Jan-2025 | Vibration sensor Precise VM333 (RS232) | 1 Unit | |
110 | Clamp meter |
08-Jan-2025 | Clamp meter Fluke 317 | 2 Unit | |
111 | AC/DC Clamp meter |
08-Jan-2025 | AC/DC Clamp meter Fluke 365 | 1 Unit | |
112 | Infrared thermometer |
08-Jan-2025 | Infrared thermometer FATOOLS M5640B | 1 Unit | |
113 | DC MilliAmp Clamp Meter |
08-Jan-2025 | DC MilliAmp Clamp Meter Kyoritsu KEW 2500 | 1 Unit | |
114 | Thermal Imagers |
08-Jan-2025 | Thermal Imagers Fluke Tis 40 | 1 Unit | |
115 | Heat Gun |
08-Jan-2025 | Heat Gun Makita HG6500 LCD Display | 1 Unit | |
116 | Phase Sequence Indicator |
08-Jan-2025 | Phase Sequence Indicator 01/09/3543 / ACCURATE | 1 Unit | |
117 | Hand Pallet Truck |
08-Jan-2025 | Hand Pallet Truck Krisbow 3Ton | 1 Unit | |
118 | Vacum Cleaner |
08-Jan-2025 | Vacum Cleaner Dry 10 Ltr Ryu | 1 Unit | |
119 | Hot Air Blower/Hotwind |
08-Jan-2025 | Hot Air Blower/Hotwind Premium LEISTER | 1 Unit | |
120 | Blower Vacum |
08-Jan-2025 | Blower Vacum Bosch Profesional GBL 800E | 2 Unit | |
121 | Tangga 12Meter |
08-Jan-2025 | Tangga 12 Meter | 1 Unit | |
122 | Tangga 4 kaki |
08-Jan-2025 | Tangga 4 kaki 4 meter | 2 Unit | |
123 | Electrostatic Oil Cleaner/Oli Purifier |
08-Jan-2025 | Electrostatic Oil Cleaner/Oli Purifier CDOC-50 | 1 Unit | |
124 | Ratchet - Puller |
08-Jan-2025 | Ratchet - Puller Model 2000 NGK 2 Ton (Jaringan) | 2 Unit | |
125 | Kikir |
08-Jan-2025 | Kikir 12 Inchi | 6 Pcs | |
126 | Grease / Minyak Gemuk |
08-Jan-2025 | Rotary 15kg | 3 Pail | |
127 | Grease Gun |
08-Jan-2025 | Grease Gum PC6000 (Tekiro) | 2 Pcs | |
128 | Jack Hammer Drill |
08-Jan-2025 | Jack Hammer Drill Makita HM MT860 / Bobok Beton (Demolation Hammer) | 3 Unit | |
129 | Jack Hammer |
08-Jan-2025 | Jack Hammer bobok jalanan Bosch GSH 16-300 | 1 Unit | |
130 | Bor Beton 13mm |
08-Jan-2025 | Bor Beton Bosch GBH 226-DRE | 2 Unit | |
131 | Bor Besi |
08-Jan-2025 | Bor Besi 13mm Bosch | 2 Unit | |
132 | Mata Bor Besi |
08-Jan-2025 | Uk. 2 sd 12mm Nachi | 2 Set | |
133 | Mato Bor Beton |
08-Jan-2025 | Uk. 10mm sd 32mm Nachi | 2 Set | |
134 | Chainsaw |
08-Jan-2025 | Chainsaw 22 Inchi Stihl | 1 Unit | |
135 | Aye Bolt M12 |
08-Jan-2025 | Aye Bolt M12 | 6 Pcs | |
136 | Aye Bolt M14 |
08-Jan-2025 | Aye Bolt M14 | 6 Pcs | |
137 | Aye Bolt M16 |
08-Jan-2025 | Aye Bolt M16 | 6 Pcs | |
138 | Aye Bolt M24 |
08-Jan-2025 | Aye Bolt M24 | 6 Pcs | |
139 | Makjun |
08-Jan-2025 | 50 Kg | ||
140 | Isolasi Listrik |
08-Jan-2025 | 12 Pcs | ||
141 | WD 40 |
08-Jan-2025 | WD 40 | 24 Pcs | |
142 | Contact Cleaner |
08-Jan-2025 | Contact Cleaner | 24 Pcs | |
143 | Lem Gasket |
08-Jan-2025 | Silicon Red Tahan Panas 100gram | 12 Pcs | |
144 | Sarung Tangan Kain |
08-Jan-2025 | 6 Lusin | ||
145 | Lem Tetes |
08-Jan-2025 | Lem Tetes Dextone | 12 Pcs | |
146 | Lem 2ton |
08-Jan-2025 | Dextone 25g | 12 Pcs | |
147 | Amplas |
08-Jan-2025 | Amplas No.60 | 10 Meter | |
148 | Amplas |
08-Jan-2025 | Amplas No.100 | 10 Meter | |
149 | Amplas |
08-Jan-2025 | Amplas No.150 | 10 Meter | |
150 | Amplas |
08-Jan-2025 | Amplas No. 240 | 10 Meter | |
151 | Amplas |
08-Jan-2025 | Amplas No.500 Tayo Waterproof | 12 Lembar | |
152 | Amplas |
08-Jan-2025 | Amplas No. 1000 Tayo Waterproof | 12 Lembar | |
153 | Lem Gasket |
08-Jan-2025 | Treebond 1104 200g | 12 Pcs | |
154 | Kawat Las |
08-Jan-2025 | Kobe Steel LB 5.2U x 3.2mm | 10 Kg | |
155 | Kawat Las |
08-Jan-2025 | Kobe Steel RB26 x 2.6mm | 10 Kg | |
156 | Kawat las Steinless |
08-Jan-2025 | Nikko Steel NSM-308 size 2,6 x 300mm | 5 Kg | |
157 | Kawat Las |
08-Jan-2025 | Kobe Steel RD20 x 2.0mm | 5 Kg | |
158 | Baut + Ring |
08-Jan-2025 | Baut M6 kunci 10 | 50 Pcs | |
159 | Baut + Ring |
08-Jan-2025 | Baut M10x5cm | 50 Pcs | |
160 | Baut + Ring |
08-Jan-2025 | Baut M30 | 30 Pcs | |
161 | O Ring Chor |
08-Jan-2025 | Uk. 1 mm NBR | 10 Meter | |
162 | O Ring Chor |
08-Jan-2025 | Uk. 2 mm NBR | 20 Meter | |
163 | O Ring Chor |
08-Jan-2025 | Uk. 4mm NBR | 20 Meter | |
164 | O Ring Chor |
08-Jan-2025 | Uk. 6mm NBR | 20 Meter | |
165 | O Ring Chor |
08-Jan-2025 | Uk. 8mm NBR | 20 Meter | |
166 | O Ring Chor |
08-Jan-2025 | Uk. 10mm NBR | 20 Meter | |
167 | O Ring Chor |
08-Jan-2025 | Uk. 12mm NBR | 20 Meter | |
168 | Foam Insulation & Constrution |
08-Jan-2025 | Xtraseal Insulation and Contruction Sealant PU Foam 750ml | 6 Kaleng | |
169 | Rubber Packing |
08-Jan-2025 | EPDM 2mm x 5mtr (Tahan panas, air dan oli) | 5 Meter | |
170 | Rubber packing |
08-Jan-2025 | EPDM 3mm x 5mtr (Tahan panas, air dan oli) | 5 Meter | |
171 | Packing gasket |
08-Jan-2025 | Jumbo Blue 1000 3mmx127cmx5mtr Non Abastos | 5 Meter | |
172 | Packing gasket |
08-Jan-2025 | Jumbo Blue 1000 2mmx127cmx5mtr non abestos | 5 Meter | |
173 | Packing gasket kertas |
08-Jan-2025 | Firefly 1m x 0.5mm x 3m | 3 Meter | |
174 | Packing gasket kertas |
08-Jan-2025 | Firefly 1m x 1mm x 3m | 3 Meter | |
175 | Seal Tip |
08-Jan-2025 | 50 Pcs | ||
176 | Isolasi Listrik |
08-Jan-2025 | Isolasi 3M 23 Rubber Splicing Tape | 6 Pcs | |
177 | Lampu Sorot LED Waterproof |
08-Jan-2025 | LED Waterproof 50watt (Tembus kabut) | 4 Unit | |
178 | Lampu Sorot LED Waterproof |
08-Jan-2025 | LED Waterproof 100watt (Tembus kabut) | 4 Unit | |
179 | Bohlam |
08-Jan-2025 | Bohlam 15 Watt Philips | 12 Pcs | |
180 | Bohlam |
08-Jan-2025 | Bohlam 23 Watt Philips | 12 Pcs | |
181 | Silica Gel |
08-Jan-2025 | Non Brand Silica Gel (Silika Gel) Blue | 5 Kg | |
182 | Senter Kepala |
08-Jan-2025 | LED 10 Watt | 4 Pcs | |
183 | MCB |
08-Jan-2025 | MCB 2A 1 Phasa | 4 Pcs | |
184 | MCB |
08-Jan-2025 | MCB 6A 1Phasa | 6 Pcs | |
185 | MCB |
08-Jan-2025 | MCB 10A 1 Phasa | 6 Pcs | |
186 | MCB |
08-Jan-2025 | MCB 50A 3Phasa | 4 Pcs | |
187 | MCCB |
08-Jan-2025 | MCCB 100A | 3 Pcs | |
188 | Kabel Listrik NYM |
08-Jan-2025 | Eterna 2x1.5mm | 50 Meter | |
189 | Kabel Listrik NYM |
08-Jan-2025 | Eterna 2x2.5mm | 50 Meter | |
190 | Kabel Listrik NYM |
08-Jan-2025 | Eterna 3x2.5mm | 50 Meter | |
191 | Kabel Listrik 3Phasa |
08-Jan-2025 | Jumbo 4x2.5mm 3Phasa | 50 Meter | |
192 | Isolasi Listrik |
08-Jan-2025 | Isolasi Listrik Nitto | 12 Pcs | |
193 | Mata Gerinda Tebal |
08-Jan-2025 | Uk. 4 Inchi | 12 Pcs | |
194 | Isolasi Kertas |
08-Jan-2025 | Uk. 1 Inchi | 12 Pcs | |
195 | Isolasi Kertas |
08-Jan-2025 | Uk. 2 Inchi | 12 Pcs | |
196 | Cabel Ties |
08-Jan-2025 | Uk. 4x200 mm | 12 Bungkus | |
197 | Cable Ties |
08-Jan-2025 | Uk. 5x300mm | 12 Bungkus | |
198 | Tali Tambang |
08-Jan-2025 | Tali Tambang Nylon 10mm | 50 Meter | |
199 | Kuas |
08-Jan-2025 | Kuas 2 Inchi | 6 Pcs | |
200 | Kuas |
08-Jan-2025 | Kuas 4 Inchi | 6 Pcs | |
201 | Kuas 6 |
08-Jan-2025 | Kuas 6 Inchi | 6 Pcs | |
202 | Brush/Sikat Kawat |
08-Jan-2025 | 6 Pcs | ||
203 | Baut + Ring |
08-Jan-2025 | Baut M12x5cm | 50 Pcs | |
204 | Baut + Ring |
08-Jan-2025 | Baut M24x10cm | 50 Pcs | |
205 | Baut + Ring |
08-Jan-2025 | Baut M16x7cm | 30 Pcs | |
206 | Pompa Celup 2 Inchi |
08-Jan-2025 | Tsurumi 2Inchi | 2 Unit | |
207 | Selang 2Inchi |
08-Jan-2025 | Selang 2 Inchi untuk pompa celup Tsurumi | 100 Meter |