Procurement Detail
| Back to PRF |
PROCLOG REQUEST FORM (PRF) |
Input Quotation |
|---|
| Company Name | : | PT THONG LANGKAT ENERGI | Description | : | Pengadaan Sparepart PLTA Batu Gajah Periode Januari 2026 |
|---|---|---|---|---|---|
| PRF No | : | 00006/TLE/I/2026 | Maker | : | Firman Oswaldo |
| PRF Date | : | 22-Jan-2026 | PIC Proclog | : | Fina Anggraini |
| Hydro Power Plant | : | Batu Gajah | Attachment | : |
| Item | Date Needed | Specification | Quantity | Attachment | |
|---|---|---|---|---|---|
| 1 | Trafo 220V 110V 1500W |
09-Feb-2026 | Trafo 220V 110V 1500W | 1 PCS | |
| 2 | Disconnecting Switch |
09-Feb-2026 | Disconnecting Switch | 1 PCS | |
| 3 | Self Retracting Cable |
09-Feb-2026 | Self Retracting Cable 4 Core | 1 Pcs | |
| 4 | Level Transmitting Controller MPM460W |
09-Feb-2026 | Level Transmitting Controller MPM460W | 1 PCS | |
| 5 | Pin Isolator |
09-Feb-2026 | Pin Isolator 20 kV | 6 PCS |
