|
Item |
Quantity |
Unit |
Requirement |
| 1. |
Custom Clearance Green Line |
1 |
Shipment |
SPPB maximum 2 days after document received
|
|
1. Inspeksi
|
|
2. P2 Approval
|
|
3. SKB Process/Masterlist
|
|
4. PFPD Approval
|
|
5. EDI / PIB
|
|
6. Administrasi Bank
|
|
7. Jasa Bongkar Muat
|
| 2. |
Handling |
1 |
Container |
-
|
|
1. General Container 20 Feet
|
|
2. General Container 40 Feet
|
|
3. Flat Rack/Open Top/High Cube 20 Feet
|
|
4. Flat Rack/Open Top/High Cube 40 Feet
|
|
5. LCL
|
| 3. |
Transportation/Delivery |
1 |
Truck |
-
|
|
1. Trucking Fuso
|
|
2. Trucking Tronton
|
|
3. Unloading at Site Forklift (15 ton)
|
|
4. Unloading at Site Crane/Mobile Crane/Crawler Crane
|
|
5. Unloading at Site Jacking
|
|
6. Mob/Demob Jacking
|
|
7. Plate
|
|
8. Pengawalan/Supervisi
|
|
9. Asuransi
|
|
10. Trailer
|
|
11. Low Bed Truck
|
|
12. Overnight Trucking
|
|
13. Trucking Mobil Pick Up
|
|
14. Trucking Diesel Engkel
|
|
15. Trucking Tronton Losbak/Trailer
|
|
16. Trucking Self Loader
|
|
17. Via Cargo Pesawat
|
|
18. Trucking Sledding
|
|
19. Wingbox
|
|
20. Container 20FT
|
|
21. Container 40FT
|
|
22. Trucking 3Way
|
|
23. Via LCL /Konsol
|
| 4. |
Biaya Pelayaran (Shipping) |
1 |
Shipment |
|
|
1. Delivery Order (DO)
|
|
2. Lift On Lift Off (LOLO)
|
| 5. |
Sewa Warehouse (if any) |
1 |
Container |
-
|
|
1. Penyimpanan
|
|
2. Shifting Container - General Container
|
|
3. Shifting Container - Flat Rack/Open Top
|
|
4. Handling (Stuffing/Unstuffing) - General Container
|
|
5. Handling (Stuffing/Unstuffing) - Flat Rack/Open Top
|
|
6. Loading on Truck
|
|
7. Forklift 7 ton
|
|
8. Crane 25 - 40 ton
|